Octavius has experience on a wide range of highways projects across the UK. Read more about them below.
Filter
HV Feeder Renewals – Portsmouth to London – fast track to completion
HV Feeder Renewals – Portsmouth to London – fast track to completion
Renewal of high voltage feeder cables is a significant ongoing programme for improving resilience of the rail network.
Replacement of ...
E&P Capability – Full speed ahead on Wessex Route
E&P Capability – Full speed ahead on Wessex Route
Such has been the success of the integration of Electrification and Plant (E&P) activities under the collaborative umbrella ...
M25 Digital Twin – 3D visualisation using Drones
M25 Digital Twin – 3D visualisation using Drones
“It’s encouraging to see that the UK is not just leading in Artificial Intelligence research, but also increasingly in ...
Social Value – STEM – creating the next generation of engineers
Social Value – STEM – creating the next generation of engineers
“It was really fun and interesting. We also work in groups which helps our teamwork and friendship. We get to ...
Rail Embankment Failures – Four Schemes in One Blockade
Rail Embankment Failures – Four Schemes in One Blockade
“Thank you for your hard work in delivering this complex job at short notice, going from no scope to a ...
A500 Etruria Widening – Open three months early
A500 Etruria Widening – Open three months early
Network open three months early
£758k saved on piling method
600 lorry movements saved
100% waste reused or recycled
New River Bridge – Collaborative Solution
New River Bridge – Collaborative Solution
“When we started on this journey, we knew that Osborne were a company that Hertfordshire County Council could trust and ...
Nazeing Road Bridge – Integrating the Technical Solution with Stakeholder Needs
Nazeing Road Bridge – Integrating the Technical Solution with Stakeholder Needs
UK bridges built by the Victorian’s were not designed with maintenance in mind unlike today’s CDM compliant structures. ...
LUL Step Free Access – Design differently to deliver on time
LUL Step Free Access – Design differently to deliver on time
A different design approach helps deliver ‘step free’ access for a tranche of London Underground stations.
Supporting the Mayor of ...
Godalming Station – ‘Access for All’ solution opens 4 weeks early
Godalming Station – ‘Access for All’ solution opens 4 weeks early
Everyone has the right to safely access our rail transport network. To make it possible there has to be an ...
Feltham Station – Step free access compliments platform extension
Feltham Station – Step free access compliments platform extension
Smart design at Feltham safely delivers step free access and closure of a dangerous level crossing. A project completed as ...
Ashmead Embankment – Rapid response critical to maintain service
Ashmead Embankment – Rapid response critical to maintain service
At Ashmead, near Basingstoke on the route to London, prolonged wet weather led to rail embankment failure. Network Rail restricted ...