Projects
Octavius has experience on a wide range of highways projects across the UK. Read more about them below.
Filter
Nazeing Road Bridge – Integrating the Technical Solution with Stakeholder Needs
Nazeing Road Bridge – Integrating the Technical Solution with Stakeholder Needs
UK bridges built by the Victorian’s were not designed with maintenance in mind unlike today’s CDM compliant structures. ...
LUL Step Free Access – Design differently to deliver on time
LUL Step Free Access – Design differently to deliver on time
A different design approach helps deliver ‘step free’ access for a tranche of London Underground stations.
Supporting the Mayor of ...
Godalming Station – ‘Access for All’ solution opens 4 weeks early
Godalming Station – ‘Access for All’ solution opens 4 weeks early
Everyone has the right to safely access our rail transport network. To make it possible there has to be an ...
Feltham Station – Step free access compliments platform extension
Feltham Station – Step free access compliments platform extension
Smart design at Feltham safely delivers step free access and closure of a dangerous level crossing. A project completed as ...
Ashmead Embankment – Rapid response critical to maintain service
Ashmead Embankment – Rapid response critical to maintain service
At Ashmead, near Basingstoke on the route to London, prolonged wet weather led to rail embankment failure. Network Rail restricted ...
Sustainable Parking at Uxbridge College
Sustainable Parking at Uxbridge College
Design/architecture & construction The car park at Uxbridge & Harrow College was designed and installed to provide additional land ...
Romsey Road Bridge M27 – Capability Fuels Creativity
Romsey Road Bridge M27 – Capability Fuels Creativity
Replacing a road bridge over the busy M27 in Hampshire required the conceptual design of a composite steel and concrete ...
River Axe flood alleviation – modular solution delivered in a nine day blockade
River Axe flood alleviation – modular solution delivered in a nine day blockade
Network Rail had to alleviate flooding on the River Axe at Broom Lane and Axe Farm, to safeguard this part ...
Gade Valley Viaduct – Offline ‘Mock ups’ benefit Customer outcomes
Gade Valley Viaduct – Offline ‘Mock ups’ benefit Customer outcomes
With vehicle numbers increasing at 7% per annum, and the estimated cost of motorway lane closures at £50,000, undertaking essential improvements to ...
Didcot Station – Temporary car deck is a speedy, sustainable, space saving solution
Didcot Station – Temporary car deck is a speedy, sustainable, space saving solution
Short on parking space and needing a permanent or temporary solution?
Parking spaces are becoming an increasingly valuable commodity. Installing ...