Rail E&P – Switchgear Renewals – Improving efficiency and certainty
Switch-gear0283a-brand-removed_O

About the project

Network Rail’s strategic plan for CP6 has a significant programme of Electrification and Plant (E&P) infrastructure renewals to continue improving reliability of the railway.

On the Wessex route, HV and DC Switchgear Renewals at Lymington, New Milton, Ashurst, Northbrook, Shawford and Fulwell were transferred to our E&P team with the GRIP Stage 4 – Form A complete. Our approach has generated significant efficiency savings at the same time as resolving access constraints in some very difficult rail locked locations.