Octavius Logo

Projects

Nazeing Road Bridge – Integrating the Technical Solution with Stakeholder Needs
Nazeing-Bridge-whole-bridge-1

About the project

UK bridges built by the Victorian’s were not designed with maintenance in mind unlike today’s CDM compliant structures. For many highway authorities this makes it both a technical and a logistical challenge to maintain and extend the assets life. To add to the difficulty, the structures often interface with the public and a myriad of stakeholders from whom consents are required.

Success is often dependent upon the approach taken to integrate the stakeholder needs into the design development so that everyone is invested in the journey through to project completion.

Project gallery

Back to top